City administrative facilities – 1,500 sq. ft. per 1,000 population must be scheduled for construction within a five-year period or prior to construction of 6,250 dwelling units, beginning at the time the need is first identified.
Libraries – 800 sq. ft. per 1,000 population must be scheduled for construction within a five-year period or prior to construction of 6,250 dwelling units, beginning at the time the need is first identified.
Parks – 3.0 acres of community park or special use area per 1,000 population within the park district ¹ must be scheduled for construction within a five-year period or prior beginning at the time the need is first identified. The five year period shall not commence prior to August 22, 2017.
Drainage – Drainage facilities must be provided as required by the city concurrent with development.
Circulation – Implement a comprehensive livable streets network that serves all users of the system – vehicles, pedestrians, bicycles and public transit. Maintain LOS D or better for all modes that are subject to the multi-modal level of service (MMLOS) standard, as identified in Table 3-1 of the General Plan Mobility Element, excluding LOS exempt intersections and streets approved by the City Council.
Fire response – No more than 1,500 dwelling units outside of a five-minute response time.
Open space – Fifteen percent of the total land area in the zone exclusive of environmentally constrained non-developable land must be set aside for permanent open space and must be available concurrent with development.
Sewer collection system – Trunk line capacity to meet demand as determined by the appropriate sewer district must be provided concurrent with development.
Schools – School capacity to meet projected enrollment within the zone as determined by the appropriate school district must be provided prior to projected occupancy.
Water distribution system – Line capacity to meet demand as determined by the appropriate water district must be provided concurrent with development. A minimum of 10-day average storage capacity must be provided prior to any development.
Wastewater treatment capacity – Sewer plant capacity is adequate for at least a five-year period.
1. "Park District" = "quadrant." There are four park districts within the city, corresponding to the four quadrants.